State of Concession 2 North draws ire of councillor

 

 

By Ron Giofu

 

A member of town council is calling for action with regards to the condition of one of the town’s rural roads.

Councillor Rick Fryer said he has fielded numerous calls with regards to the state of Concession 2 North, stating there have been many temporary repairs done but not enough to ensure the road is in good shape.

“I don’t know how many repairs we’ve done to that road,” he said.

Councillor Rick Fryer has expressed concern with the condition of Concession 2 North.

Pointing out there is a roads needs study in Amherstburg, Fryer believed that Concession 2 North between Middle Side Road and the bridge over the Long Marsh Drain should be at the top of the list. He said “patchwork” repairs have been done and believed that residents who live and travel down that road should see major repairs and upgrades.

“Those residents deserve a new one,” he said of the road. “We need to aggressively fix that road.”

The bridge over Long Marsh Drain is scheduled for replacement this year. The bridge, located near River Canard, will be replaced at a cost of approximately $1.2 million and look like a modern bridge rather than the bow arch bridge that currently is situated there.

Comments are closed.